LATEST NEWS

Damen and Rohde & Schwarz help to strengthen the Royal Netherlands Navy’s maritime replenishment capacity

Damen Schelde Naval Shipbuilding signed a contract with Rohde & Schwarz for the delivery and installation of internal and external communication systems for the Royal Netherlands Navy’s Combat Support Ship, Den Helder.

The Royal Netherlands Navy’s (RNLN) new Combat Support Ship (CSS), Den Helder, to be built by Damen Schelde Naval Shipbuilding (DSNS), will strengthen the navy’s replenishment capacity at sea. Delivery of the ship is scheduled for the second quarter of 2024.

DSNS signed a contract with Rohde & Schwarz Benelux B.V. for the delivery and installation of a state-of-the-art integrated communications system for the RNLN’s CSS, Den Helder.

With this contract, RNLN will receive a system based on proven technology and standardized to provide commonality across the Dutch naval fleet. For more than 20 years, RNLN has been using Rohde & Schwarz communications systems on their vessels with high level reliability and performance during daily operations. This commonality offers not only crew familiarity, but also optimizes training, maintenance and many other processes.

Arjan Risseeuw, Project Director of the CSS at DSNS states: “Rohde & Schwarz have a good track record in delivering their equipment to RNLN vessels. We have collaborated with them before, on the Joint Support Ship HNLMS Karel Doorman, for which the Defence Materiel Organisation acted as intermediary for the Rohde & Schwarz equipment it purchased. I am looking forward to working directly with Rohde & Schwarz on this project in order to provide the CSS with a good communication suite.”

Mischa van Santen, Sales Manager at Rohde & Schwarz Benelux continues: “Rohde & Schwarz Benelux will act as the communications system integrator for DSNS. Our local engineering team in Utrecht will make sure that we deliver according to schedule and budget, as well as that the system is supported through life by our Dutch personnel. Rohde & Schwarz Benelux currently also executes work together with Damen Shipyards in Den Helder for the current refit programs of the RNLN support ship, HNLMS Pelikaan, and the Hydrographic vessels, HNLMS Snellius and HNLMS Luymes.”

For CSS, Rohde & Schwarz will supply a fully integrated communications system, including R&S M3SR software defined radios (R&S Series4100 HF and R&S Series4400 VHF/UHF).


SIVAN

Recent Posts

IBM Quantum Computer Accurately Simulates Real Magnetic Materials, Reproducing National Laboratory Data

IBM (NYSE: IBM) today announced new results that its quantum computer can simulate real magnetic materials…

44 minutes ago

Arrow Electronics Announces New Single Pair Ethernet Reference Design Featuring Bourns, Microchip and Amphenol Technology

Arrow Electronics has announced the launch of a new evaluation platform, jointly designed in collaboration…

22 hours ago

Siemens introduces AI-powered on-premises analytics for industrial drivetrain systems

Siemens has unveiled Drivetrain Analyzer Onsite, a new on-premises analytics solution for industrial drive systems,…

1 day ago

Menlo Micro Achieves Key Milestone in U.S. Navy Advanced Circuit Breaker Program, Validating Scalable MEMS Power Switching Leadership

Menlo Microsystems, Inc. (Menlo Micro), a leader in high-performance switches, today announced the successful completion…

3 days ago

Wireless modules for embedded systems now available from Tria Technologies

Multi-protocol modules support WiFi®, Bluetooth® and mesh networking standards Tria Technologies™, an Avnet company specializing…

3 days ago

Tower Semiconductor and Coherent Demonstrate 400Gbps/lane Data Transmission with a Silicon Modulator in a Production-Ready Sipho Process

 The demonstration uses a silicon MZM without use of exotic materials targeting next-generation 3.2T optical…

3 days ago