Categories: Uncategorized

Hitachi Rail Italy wins a new contract from Ferrovie Nord Milano worth 40 million euro

Naples, Italy, 17 December, 2015 — Hitachi Rail Italy S.p.A. today announced that it had signed a contract for 40 million euro for the manufacturing of new “TSR”, trains for regional services, that will complement existing Ferrovie Nord Milano (FNM) fleet.

FNM has exercised an option in the contract signed by its subsidiary in 2006. Under the new contract, HRI will supply FNM with additional 4 trains with 4 cars each, totalling 16 cars, which will be delivered to the customer between July 2017 and November 2017 with operation due to commence soon after delivery. The cars will operate on several lines around Milan. Following the delivery of these optional units, HRI will have provided a total of 141 cars, consisting of 60 leading cars and 81 intermediate cars to FNM Group.

The TSR is a double-deck train, first designed in 2004, with distributed power characterized by motorized cars, allowing flexibility in the formation and high performance in operation. It features strong acceleration capabilities providing a powerful start at the departure, with each coach motorized with one motor bogie. The latest model features improved passenger comfort and installed internal closed circuit video cameras act as a deterrent against vandalism and for the control by the on board crew.

The 4 car configuration carries more than 400 seated people and400 standing passengers. The length of each car is 26 meters and the maximum speed is 140 km/h. The car body is constructed from aluminum alloy.

The cars can be coupled to make trains with 3, 4, 5 or 6 car configurations maintaining the same acceleration capability with the power distributed over each car. The trains can be coupled together reaching a total of 12 cars. There are 96 seats on the leading cars and 122 seats on the intermediate cars. Depending upon the configuration, the TSR transportation capacity can vary form 314 seats for a single 3 car train to 1360 seats for two 6 car trains coupled.

The vehicles will be assembled in the Pistoia Plant. The power components such as motors, converters and the train control and monitoring system will be manufactured in the Naples Plant.

Liat

Recent Posts

NVIDIA and AWS Expand Full-Stack Partnership, Providing the Secure, High-Performance Compute Platform Vital for Future Innovation

AWS integrates NVIDIA NVLink Fusion into its custom silicon, including the next-generation Tranium4 chip, Graviton…

3 days ago

Molex Names Top 10 Connectivity and Electronics Design Predictions for 2026, Fueled by Far-Reaching Impact of Artificial Intelligences Across Major Industries

Intensifying AI demands continue to proliferate across aerospace and defense, automotive, consumer electronics, data center,…

3 days ago

Tria Technologies to bring Qualcomm DragonwingTM IQ-6 Series to market with two new compute modules

 TRIA SM2S-IQ615 and TRIA OSM-LF-IQ615 modules enable next-generation edge AI systems across a wide range…

3 days ago

At NeurIPS, NVIDIA Advances Open Model Development for Digital and Physical AI

NVIDIA releases new AI tools for speech, safety and autonomous driving — including NVIDIA DRIVE…

3 days ago

OMRON eases PCB-relay assembly and replacement with P6K surface-mountable sockets

 P6K sockets for G6K through-hole relays ensure reliability, flexibility, and repairability  OMRON Electronic Components Europe…

3 days ago

GEOX.AI and Mitsui Sumitomo Insurance Launch AI-Powered Initiative to Assess Building Risk Across Japan

GEOX.AI, a global leader in AI-driven property intelligence, announced today a strategic partnership with Mitsui…

3 days ago